How to prevent the cloth breakage. The main method, we make an explanation below.
Precautions:
1, the filter cloth rupture switch delay 2 seconds to stop the change instantaneous stop, deviation switch off delay of 5 seconds to stop the delay of 2 seconds to stop, complete the transaction approval and change.
2, soft light word alarm screen to increase abnormal alarm dehydrator.
3, dehydration machine undercut Floor openings there is 200mm widened space, widen the mouth of the material.
4, the operation observed fracture and deviation signal installation is reasonable, there is no need for improvement, completed next week.
5, operators to increase inspection efforts to shorten the inspection time (previous 2 hours), found that blocking material immediately notify the maintenance staff, maintenance personnel should be present within 20 minutes to clear the deal. Handover of the value of each fall hopper clean up as a shift content.
6, to strengthen the operation equipment screen and industrial television monitoring.
(Addtime:2017-11-9)